Flying Colours Corp. KSUS begins first phase of expansion at St. Louis facility

Flying Colours Press Release | October 2, 2017

Estimated reading time 3 minutes, 26 seconds.

Ahead of this year’s NBAA-BACE, Flying Colours–booth N5908–announced on Oct. 1, 2017, that the third phase of the Canadian company’s long-term expansion strategy has begun; work is under way on the first round of infrastructure development at its St. Louis, Mo. facility.

Flying Colours Corp. begins the first phase of the St. Louis facility expansion.
Flying Colours Corp. begins the first phase of the St. Louis facility expansion. The new facility workshop will more than double the size of the existing one. Flying Colours Photo

The project will include the addition of a new building, the upgrading of several back shops, a doubling in size of the cabinetry workshop and a workforce growth of 30 per cent.

The new Flying Colours KSUS edifice is conveniently located at the end of the Spirit of St. Louis Airport runway, and it gives easy access to the existing Flying Colours’ hangars.

When the doors open in mid-December, a further 40,300 square feet will be added to the Flying Colours Corp. North American footprint.

The new site’s layout has been specifically designed to improve productivity and efficiency, and to streamline the workflow. When the doors open on the bright, white open-plan interior, it will house a state-of-the-art cabinetry workshop that more than doubles the size of the existing St. Louis woodworking shop.

The fully refurbished facility will comfortably accommodate a CNC room for design, an expansive machine room with a range of detailing tools, two dedicated temperature controlled spray booths, insulated buffing and sanding sections, two varnish and paint mixing rooms, and assembly, framing and finishing areas.

A unique feature of the new unit is the installation of an enclosed “curing” room, which will be used to bake the varnish and paint the monument cutouts.

Upgraded upholstery, avionics and engineering workshops will also be accommodated in the modernized building. A series of offices for production control planning and production management teams–as well as conference rooms, storage areas, and further offices–will complement the workshops and provide comfortable, stylish customer meeting areas as well.

To gear up for the opening in mid-December, Flying Colours is already busy recruiting a team of over 70 workers, and it is making the most of the rich source of talent in the St. Louis area.

“Our new building gave us a blank canvas on which we have designed and created the ultimate cabinetry workshop. It will look as pristine as an operating theatre when we open, providing a great work environment for our existing and new team members, and [it will be] a superb location for customer visits. We are very excited about our first phase of growth here,” said Sean Gillespie, executive vice-president of Flying Colours Corp.

This expansion phase represents a multimillion-dollar investment from Flying Colours; the company committed to the project having won a significant set of cabinetry projects, for which work will begin in Q1 2018.

With the additional building, the Flying Colours Corp. KSUS’ footprint will exceed more than 100,000 sq. ft. in total.

Notice a spelling mistake or typo?

Click on the button below to send an email to our team and we will get to it as soon as possible.

Report an error or typo

Have a story idea you would like to suggest?

Click on the button below to send an email to our team and we will get to it as soon as possible.

Suggest a story

Leave a comment

Your email address will not be published. Required fields are marked *